佳礼资讯网

 找回密码
 注册

ADVERTISEMENT

楼主: sasasa

我的新家,(pg20)有设计图,第一批淘的宝贝到了~PG30,第二批PG37

  [复制链接]
 楼主| 发表于 13-12-2013 09:13 AM | 显示全部楼层
帮忙看看我的quotation好吗?

Re :BUILD  IN CARPENTRY RENOVATION WORKSBUILD  IN CARPENTRY WORKS         Quotation
Thank  you for inviting us to quote you as the above stated project.




As  reference to our previous meeting, we are now pleased to submit our Quotation  for your prompt consideration.














Carpentry buid in work




















1)Entrance








a)shoes rack cabinet 6 ft.




RM            4,200.00













2)Foyer









a)Feature decorative design  wall c/w mirror , laminated wood & wall paper finish 14 ft.RM            9,800.00













3)Dining









a)new feature design  decorative wall panel 8ft c/w mirror & laminated wood finish. .RM            6,400.00













4) dry kitchen








a) dry kitchen base units cabinet 10ft.



RM            5,500.00
b)dry kitchen wall units  cabinet 10 ft.



RM            5,500.00
c)drawer sets with railing  c/w Blum system railing.


RM            1,500.00
d)solid surface table top  finish 10 ft for dry kitchen


RM            2,800.00
e)center Island counter top  6 ft




RM            4,800.00
f)center Island solid  suface table top finish . 6 ft


RM            1,680.00













5)wet kitchen








a)L shape base unit door  cover only 25ft.



RM            8,750.00
b)wall unit cabinet 6ft




RM            3,300.00
c)L shape concrete table  c/w 2ft x 2ft polish tiles finish.25 ft

RM            5,000.00
d)Drawer sets with railing  c/w Blum system railing.


RM            1,500.00













6)Living









a)TV base cabinet c/w  drawer & glass door 12 ft.


RM            5,400.00
b)TV back drop feature  design wall panel 12 ft c/w colour glass & laminated wood finish.RM            9,000.00













7)Bedroom 4 c/w laminated ,  colour glass , mirror & wall paper finish.



a)Wardbrode 7ft c/w Alum  sliding colour glass door.


RM            5,600.00
b)bed drop feature design  wall panel.



RM            4,200.00
c)study table top c/w  drawer sets 7 ft.



RM            3,500.00
d)whole room wall paper  finish.




RM            3,000.00













8)first floor study areas







a)book rack cabinet cum  display cabinet 6 ft


RM            4,200.00
b)study table top c/w  drawer 12 ft.



RM            6,000.00
c)low filing cabinet 4 ft




RM            2,400.00
d)Wall cabinet cum open  shelf display rack 10 ft


RM            5,000.00













9) Master bedroom 1








a)U shape walk in Wardbrode  24 ft c/w Alum frame colour glass open door.
RM          19,200.00
b)partition c/w door open  for entrance walk in wardbrode.

RM            2,800.00
c)dreesing table c/w mirror  & drawer 5ft.



RM            2,600.00
d)study table c/w dawer  10ft.




RM            4,500.00
e)extra wardbrode c/w Alum  frame colour glass open door 5 ft.

RM            4,000.00
f)king size bed frame c/w  bed head back drop design panel.

RM            5,500.00
g)bed side table 2 nos.




RM            2,200.00
h)Tv cabinet c/w back drop  wall feature design wall on wardbrode backing. 10ft.RM            6,500.00
i)wall paper for the whole  room wall



RM            3,500.00













10)secand floor main room







a)single bed frame c/w  bottom cabinet storge.


RM            2,000.00
b)wardbrode 4 ft c/w  laminated wood finish .


RM            2,800.00
c)small dressing cum  warking table c/w dawer. 4 ft.


RM            1,600.00













11)MISC









a)Ground floor plaster  ceiling c/w 2 design finish.


RM            6,500.00













b)new wiring works lighting  point for ground floor only





i)light point 30 nos




RM            2,400.00

ii)power point 10 nos




RM            1,100.00

iii)TV point 1 no





RM               300.00

iv)Fan point 2 nos




RM               300.00

v)installation for whole  house light fitting .


RM            2,000.00













12)option for cover void  areas







a)to remove & disposed  the existing metal railing.


RM               500.00
b)To construct & supply  new concrete slab to cover void areas.

RM            8,800.00
c)To install to match back  existing floor finishing to make good finish.
RM            3,000.00

@










13)a)  To remove & disposed the existing metal  railing.


RM               500.00

b)  To supply & install new partition  railing cum display shelf up to ceiling.
RM            6,800.00






















TOTALRM













Noted:










1

Term of payment

30% upon confirmation










60% on progresssive claim









10% upon completed



2

Commencing of work

4 months




3

Validity


1 month




4

Final invoicing will be  based on final measurement at actual site



5

Any alteration and  amendments of site from the above stated quotes will be considered as  variation order
6

Drawings is an artist  impression only and subject to confirmation of material and color















Assuring  you of our best service & attention at all times. Should you have any  question or concern, please do not
hesitate  to forward it to us.








回复

使用道具 举报


ADVERTISEMENT

发表于 14-12-2013 04:50 AM | 显示全部楼层
你买第三间产业只能贷款70%对吗?第四间呢?
回复

使用道具 举报

 楼主| 发表于 14-12-2013 08:50 AM | 显示全部楼层
prodigys 发表于 14-12-2013 04:50 AM
你买第三间产业只能贷款70%对吗?第四间呢?

超过2间产业,都只能贷款max 70%哦
回复

使用道具 举报

发表于 14-12-2013 10:54 PM | 显示全部楼层
不打算找我嗎?你的quotation價錢不便宜
回复

使用道具 举报

 楼主| 发表于 14-12-2013 11:06 PM | 显示全部楼层
KimD@ngD@ng 发表于 14-12-2013 10:54 PM
不打算找我嗎?你的quotation價錢不便宜

那个是designer quote他家的价钱,
装修不一定要找他们的

回复

使用道具 举报

发表于 14-12-2013 11:08 PM | 显示全部楼层
sasasa 发表于 14-12-2013 11:06 PM
那个是designer quote他家的价钱,
装修不一定要找他们的

我就覺得應該是ID quote的價錢
回复

使用道具 举报

Follow Us
 楼主| 发表于 14-12-2013 11:16 PM | 显示全部楼层
KimD@ngD@ng 发表于 14-12-2013 11:08 PM
我就覺得應該是ID quote的價錢

kdd觉得那个部分的价钱quote的贵啊,行情大概是多少呢
回复

使用道具 举报

发表于 14-12-2013 11:18 PM | 显示全部楼层
sasasa 发表于 14-12-2013 11:16 PM
kdd觉得那个部分的价钱quote的贵啊,行情大概是多少呢

很難講所謂的行情價。畢竟有時候一些東西除了要看價錢以外,還有服務等等。。。。
如果你有時間,去多幾間問價錢或多了解materials后就大概知道了。
回复

使用道具 举报


ADVERTISEMENT

 楼主| 发表于 14-12-2013 11:54 PM | 显示全部楼层
KimD@ngD@ng 发表于 14-12-2013 11:18 PM
很難講所謂的行情價。畢竟有時候一些東西除了要看價錢以外,還有服務等等。。。。
如果你有時間,去多幾 ...

哦哦,好的~

反正没有在赶cny搬进去,可以慢慢研究
回复

使用道具 举报

发表于 16-12-2013 03:31 AM | 显示全部楼层
找KimD@ngD@ng  好点。。
回复

使用道具 举报

 楼主| 发表于 16-12-2013 09:23 AM | 显示全部楼层
prodigys 发表于 16-12-2013 03:31 AM
找KimD@ngD@ng  好点。。

嗯嗯,等我的老公回来会过去找她坐坐
回复

使用道具 举报

 楼主| 发表于 17-12-2013 10:51 AM | 显示全部楼层
帮忙看看我的quotation好吗?
company A

Re :BUILD  IN CARPENTRY RENOVATION WORKSBUILD  IN CARPENTRY WORKS

        Quotation
Thank  you for inviting us to quote you as the above stated project.




As  reference to our previous meeting, we are now pleased to submit our Quotation  for your prompt consideration.














Carpentry buid in work




















1)Entrance








a)shoes rack cabinet 6 ft.




RM            4,200.00













2)Foyer









a)Feature decorative design  wall c/w mirror , laminated wood & wall paper finish 14 ft.RM            9,800.00













3)Dining









a)new feature design  decorative wall panel 8ft c/w mirror & laminated wood finish. .RM            6,400.00













4) dry kitchen








a) dry kitchen base units cabinet 10ft.



RM            5,500.00
b)dry kitchen wall units  cabinet 10 ft.



RM            5,500.00
c)drawer sets with railing  c/w Blum system railing.


RM            1,500.00
d)solid surface table top  finish 10 ft for dry kitchen


RM            2,800.00
e)center Island counter top  6 ft




RM            4,800.00
f)center Island solid  suface table top finish . 6 ft


RM            1,680.00













5)wet kitchen








a)L shape base unit door  cover only 25ft.



RM            8,750.00
b)wall unit cabinet 6ft




RM            3,300.00
c)L shape concrete table  c/w 2ft x 2ft polish tiles finish.25 ft

RM            5,000.00
d)Drawer sets with railing  c/w Blum system railing.


RM            1,500.00













6)Living









a)TV base cabinet c/w  drawer & glass door 12 ft.


RM            5,400.00
b)TV back drop feature  design wall panel 12 ft c/w colour glass & laminated wood finish.RM            9,000.00













7)Bedroom 4 c/w laminated ,  colour glass , mirror & wall paper finish.



a)Wardbrode 7ft c/w Alum  sliding colour glass door.


RM            5,600.00
b)bed drop feature design  wall panel.



RM            4,200.00
c)study table top c/w  drawer sets 7 ft.



RM            3,500.00
d)whole room wall paper  finish.




RM            3,000.00













8)first floor study areas







a)book rack cabinet cum  display cabinet 6 ft


RM            4,200.00
b)study table top c/w  drawer 12 ft.



RM            6,000.00
c)low filing cabinet 4 ft




RM            2,400.00
d)Wall cabinet cum open  shelf display rack 10 ft


RM            5,000.00













9) Master bedroom 1








a)U shape walk in Wardbrode  24 ft c/w Alum frame colour glass open door.
RM          19,200.00
b)partition c/w door open  for entrance walk in wardbrode.

RM            2,800.00
c)dreesing table c/w mirror  & drawer 5ft.



RM            2,600.00
d)study table c/w dawer  10ft.




RM            4,500.00
e)extra wardbrode c/w Alum  frame colour glass open door 5 ft.

RM            4,000.00
f)king size bed frame c/w  bed head back drop design panel.

RM            5,500.00
g)bed side table 2 nos.




RM            2,200.00
h)Tv cabinet c/w back drop  wall feature design wall on wardbrode backing. 10ft.RM            6,500.00
i)wall paper for the whole  room wall



RM            3,500.00













10)secand floor main room







a)single bed frame c/w  bottom cabinet storge.


RM            2,000.00
b)wardbrode 4 ft c/w  laminated wood finish .


RM            2,800.00
c)small dressing cum  warking table c/w dawer. 4 ft.


RM            1,600.00













11)MISC









a)Ground floor plaster  ceiling c/w 2 design finish.


RM            6,500.00













b)new wiring works lighting  point for ground floor only





i)light point 30 nos




RM            2,400.00

ii)power point 10 nos




RM            1,100.00

iii)TV point 1 no





RM               300.00

iv)Fan point 2 nos




RM               300.00

v)installation for whole  house light fitting .


RM            2,000.00













12)option for cover void  areas







a)to remove & disposed  the existing metal railing.


RM               500.00
b)To construct & supply  new concrete slab to cover void areas.

RM            8,800.00
c)To install to match back  existing floor finishing to make good finish.
RM            3,000.00

@










13)a)  To remove & disposed the existing metal  railing.


RM               500.00

b)  To supply & install new partition  railing cum display shelf up to ceiling.
RM            6,800.00






















TOTALRM













Noted:










1

Term of payment

30% upon confirmation










60% on progresssive claim









10% upon completed



2

Commencing of work

4 months




3

Validity


1 month




4

Final invoicing will be  based on final measurement at actual site



5

Any alteration and  amendments of site from the above stated quotes will be considered as  variation order
6

Drawings is an artist  impression only and subject to confirmation of material and color















Assuring  you of our best service & attention at all times. Should you have any  question or concern, please do not
hesitate  to forward it to us.









Company B
q1.png
q2.png
q3.png
q4.png 本帖最后由 sasasa 于 23-12-2013 11:12 PM 编辑

回复

使用道具 举报

发表于 17-12-2013 07:11 PM 来自手机 | 显示全部楼层
家私价钱高了点,多一点看看,一長尺都是RM350到450
回复

使用道具 举报

 楼主| 发表于 17-12-2013 07:22 PM | 显示全部楼层
okman888 发表于 17-12-2013 07:11 PM
家私价钱高了点,多一点看看,一長尺都是RM350到450

好的,谢谢你的回复 本帖最后由 sasasa 于 18-12-2013 08:59 AM 编辑

回复

使用道具 举报

发表于 18-12-2013 07:02 AM | 显示全部楼层
看了很晕。。不是专业的很难帮你。。。

跟着感觉走。。。

你的。。LEVEL 超过这里的人多多了。。。。。
回复

使用道具 举报

 楼主| 发表于 18-12-2013 09:29 AM | 显示全部楼层
prodigys 发表于 18-12-2013 07:02 AM
看了很晕。。不是专业的很难帮你。。。

跟着感觉走。。。

谢谢你的捧场和回复~

装修也是很头疼一下
回复

使用道具 举报


ADVERTISEMENT

发表于 19-12-2013 01:31 AM | 显示全部楼层
价钱怎么那么高?
回复

使用道具 举报

发表于 19-12-2013 03:58 AM | 显示全部楼层
你的价钱肯定被开到很高。。那么大工程。。人家开便宜你敢让他做吗?

你的case要求。quality 跟信用多点。。。
回复

使用道具 举报

 楼主| 发表于 19-12-2013 08:36 AM | 显示全部楼层
联顺室内设计 发表于 19-12-2013 01:31 AM
价钱怎么那么高?

company B的价钱和材料,会不会比较好点呢?
请问价钱高的部分是哪里呢?
本帖最后由 sasasa 于 19-12-2013 08:48 AM 编辑

回复

使用道具 举报

 楼主| 发表于 19-12-2013 08:48 AM | 显示全部楼层
prodigys 发表于 19-12-2013 03:58 AM
你的价钱肯定被开到很高。。那么大工程。。人家开便宜你敢让他做吗?

你的case要求。quality 跟信用多点 ...

没有啦,也是要顾到budget啦

起码先知道要做哪些部分,和大概的价钱,
过后再决定要他们全包还是自己找人装修
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

 

ADVERTISEMENT



ADVERTISEMENT



ADVERTISEMENT

ADVERTISEMENT


版权所有 © 1996-2023 Cari Internet Sdn Bhd (483575-W)|IPSERVERONE 提供云主机|广告刊登|关于我们|私隐权|免控|投诉|联络|脸书|佳礼资讯网

GMT+8, 28-11-2024 01:15 AM , Processed in 0.178292 second(s), 25 queries , Gzip On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表