发表于 27-4-2018 05:20 AM
|
显示全部楼层
本帖最后由 icy97 于 4-5-2018 04:11 AM 编辑
Type | Announcement | Subject | OTHERS | Description | LETTER OF AWARD FROM THE ENERGY COMMISSION OF MALAYSIA | Protasco Berhad (“Protasco”) is pleased to announce that I2 Solarpark One Sdn. Bhd. (“I2 Solarpark”), 44% owned by a subsidiary of the Company, Ikram Greentech Sdn. Bhd., has received a Letter of Award from the Energy Commission of Malaysia, to develop the Large Scale Solar Photovoltaic (“LSSPV”) Plant of 6.80 MW a.c. at Mukim Sungei Baru Tengah, Alor Gajah, Melaka (“Project”). The LSSPV Plant is expected to commence operation by December 2020.
Consequent to the award of the Project, I2 Solarpark has signed a 21-year Power Purchase Agreement with Tenaga Nasional Berhad.
The Project is valued at approximately RM92 million and is expected to contribute positively to the future earnings of the Protasco Group. |
|
|
|
|
|
|
|
|
发表于 8-5-2018 07:37 PM
|
显示全部楼层
Profile for Securities of PLC
Instrument Category | Securities of PLC | Instrument Type | Warrants | Description | Issuance of 106,051,448 warrants ("Warrants") in Protasco Berhad ("Protasco") on the basis of 1 Warrant for every 4 existing ordinary shares in Protasco ("Protasco Shares") |
Listing Date | 02 May 2018 | Issue Date | 26 Apr 2018 | Issue/ Ask Price | Not Applicable | Issue Size Indicator | Unit | Issue Size in Unit | 106,051,448 | Maturity | Mandatory | Maturity Date | 25 Apr 2023 | Revised Maturity Date |
| Name of Guarantor | Not Applicable | Name of Trustee | Not Applicable | Coupon/Profit/Interest/Payment Rate | Not Applicable | Coupon/Profit/Interest/Payment Frequency | Not Applicable | Redemption | Not Applicable | Exercise/Conversion Period | 5.00 Year(s) | Revised Exercise/Conversion Period | Not Applicable | Exercise/Strike/Conversion Price | Malaysian Ringgit (MYR) 0.7500 | Revised Exercise/Strike/Conversion Price | Not Applicable | Exercise/Conversion Ratio | 1:1 | Revised Exercise/Conversion Ratio | Not Applicable | Mode of satisfaction of Exercise/ Conversion price | Cash | Settlement Type/ Convertible into | Physical (Shares) |
|
|
|
|
|
|
|
|
发表于 11-5-2018 04:02 AM
|
显示全部楼层
|
|
|
|
|
|
|
发表于 9-6-2018 04:14 AM
|
显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
31 Mar 2018 |
| INDIVIDUAL PERIOD | CUMULATIVE PERIOD | CURRENT YEAR QUARTER | PRECEDING YEAR
CORRESPONDING
QUARTER | CURRENT YEAR TO DATE | PRECEDING YEAR
CORRESPONDING
PERIOD | 31 Mar 2018 | 31 Mar 2017 | 31 Mar 2018 | 31 Mar 2017 | $$'000 | $$'000 | $$'000 | $$'000 |
1 | Revenue | 157,470 | 132,172 | 157,470 | 132,172 | 2 | Profit/(loss) before tax | 4,346 | 6,724 | 4,346 | 6,724 | 3 | Profit/(loss) for the period | 1,288 | 5,016 | 1,288 | 5,016 | 4 | Profit/(loss) attributable to ordinary equity holders of the parent | -2,141 | 3,298 | -2,141 | 3,298 | 5 | Basic earnings/(loss) per share (Subunit) | -0.50 | 0.78 | -0.50 | 0.78 | 6 | Proposed/Declared dividend per share (Subunit) | 0.00 | 0.00 | 0.00 | 0.00 |
|
| AS AT END OF CURRENT QUARTER | AS AT PRECEDING FINANCIAL YEAR END | 7
| Net assets per share attributable to ordinary equity holders of the parent ($$) | 0.8797 | 0.9336
|
|
|
|
|
|
|
|
|
发表于 8-7-2018 02:31 AM
|
显示全部楼层
Type | Announcement | Subject | OTHERS | Description | NOTICE OF ADJUDICATION UNDER SECTION 8 OF THE CONSTRUCTION INDUSTRY PAYMENT & ADJUDICATION ACT 2012 SERVED ON A SUBSIDIARY | Reference is made to the Company’s announcement on 28 February 2018 on the Notice of Adjudication pursuant to Section 8 of Construction Industry Payment Adjudication Act 2012 served by Kuasatek (M) Sdn Bhd (“Kuasatek”) on HCM Engineering Sdn Bhd (“HCM”), a wholly owned subsidiary of the Company for the sum of RM 3,270,635.20 (“Claim”).
The Company wishes to announce that HCM had received Adjudication Decision whereby HCM shall pay to Kuasatek the sum of RM2,959,490.44 within 14 days from the date of the said Adjudication Decision.
The Claim was in relation to a dispute arising between HCM and Kuasatek pursuant to a Letter of Appointment for Mechanical and Electrical Works Packages (Contract No: HCM/P48-AFC/LA/C/16/V1(07) dated 15 March 2016, a work package under a project previously awarded to HCM known as “The Design And Built Contract For The Proposed Additional Of A 4 Storey Office Building With Basement Car Parking To The Existing Facilities On Lot No. 38627, Bukit Jalil, Mukim Petaling, Daerah Kuala Lumpur, Malaysia For Asian Football Confederation.” Kuasatek was the mechanical and electrical works sub-contractor for HCM.
HCM shall seek advice from its firm of solicitors on the Adjudication Decision and will make further announcements on any material development on this matter in due course. |
|
|
|
|
|
|
|
|
发表于 11-8-2018 04:16 AM
|
显示全部楼层
Type | Announcement | Subject | OTHERS | Description | NOTICE OF ADJUDICATION UNDER SECTION 8 OF THE CONSTRUCTION INDUSTRY PAYMENT & ADJUDICATION ACT 2012 SERVED ON A SUBSIDIARY | Reference is made to the Company’s announcement on 6 July 2018 that HCM Engineering Sdn Bhd (“HCM”), a subsidiary of the Company had received Adjudication Decision whereby HCM shall pay to Kuasatek (M) Sdn Bhd (“Kuasatek”) the sum of RM2,959,490.44 within 14 days from the date of the said Adjudication Decision.
The Company wishes to announce that HCM has on 8 August 2018, filed the following applications in the High Court of Malaya at Kuala Lumpur (“KL High Court”): (i) An application by way of Originating Summons to set aside the Adjudication Decision pursuant to Section 15(b) and Section 15(d) of the Construction Industry Payment Adjudication Act 2012 (“the Setting Aside Application”);
(ii) An application by way of Originating Summons to stay the Adjudication Decision pursuant to Section 16 of the Construction Industry Payment Adjudication Act 2012 pending arbitration (“the Stay Application”); and
(iii) An ex-parte application for Fortuna Injunction (“the Fortuna Injunction Application”) against Kuasatek restraining Kuasatek from enforcing and/or executing the Adjudication Decision.
It is also to inform that: (i) HCM has served a Notice To Request For Arbitration dated 6 August 2018 to Kuasatek to refer the Claim to arbitration pursuant to Article 3, Part II of the Asian International Arbitration Rules 2018; and
(ii) Kuasatek has, on 9 August 2018, served on HCM, an application by way of Originating Summons for an order that the Adjudication Decision dated 4 July 2018 be enforced as a judgment against HCM in the High Court pursuant to Section 28(1) of the Construction Industry Payment Adjudication Act 2012 (“the Enforcement Application”). |
|
|
|
|
|
|
|
|
发表于 30-8-2018 05:38 AM
|
显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
30 Jun 2018 |
| INDIVIDUAL PERIOD | CUMULATIVE PERIOD | CURRENT YEAR QUARTER | PRECEDING YEAR
CORRESPONDING
QUARTER | CURRENT YEAR TO DATE | PRECEDING YEAR
CORRESPONDING
PERIOD | 30 Jun 2018 | 30 Jun 2017 | 30 Jun 2018 | 30 Jun 2017 | $$'000 | $$'000 | $$'000 | $$'000 |
1 | Revenue | 242,183 | 219,762 | 399,653 | 351,934 | 2 | Profit/(loss) before tax | 3,392 | 16,266 | 7,738 | 22,990 | 3 | Profit/(loss) for the period | -407 | 11,554 | 881 | 16,570 | 4 | Profit/(loss) attributable to ordinary equity holders of the parent | -959 | 7,899 | -3,100 | 11,197 | 5 | Basic earnings/(loss) per share (Subunit) | -0.19 | 1.60 | -0.63 | 2.26 | 6 | Proposed/Declared dividend per share (Subunit) | 0.00 | 0.00 | 0.00 | 0.00 |
|
| AS AT END OF CURRENT QUARTER | AS AT PRECEDING FINANCIAL YEAR END | 7
| Net assets per share attributable to ordinary equity holders of the parent ($$) | 0.7506 | 0.9336
|
|
|
|
|
|
|
|
|
发表于 17-10-2018 01:42 AM
|
显示全部楼层
Type | Announcement | Subject | OTHERS | Description | NOTICE OF ADJUDICATION UNDER SECTION 8 OF THE CONSTRUCTION INDUSTRY PAYMENT & ADJUDICATION ACT 2012 SERVED ON A SUBSIDIARY | Reference is made to the Company’s announcement on 10 August 2018.
The Company wishes to update that The High Court of Malaya at Kuala Lumpur has delivered the following decisions following the applications filed by HCM Engineering Sdn Bhd (“HCM”), a subsidiary of the Company in relation to the Adjudication Decision dated 4 July 2018 pursuant to the Construction Industry Payment and Adjudication Act 2012: -
i) the Originating Summons filed by HCM to set aside the Adjudication Decision dated 4 July 2018 obtained by the Respondent, Kuasatek (M) Sdn Bhd (“Kuasatek”) is dismissed with costs;
ii) the Originating Summons filed by HCM for stay of the said Adjudication Decision is dismissed with costs except for the following items in the Adjudication Decision which has been allowed to be stayed:
a) Finance charges; and b) Preparation of documents and research; and
iii) The Originating Summons filed by Kuasatek to enforce the said Adjudication Decision is allowed with costs except for the following items in the Adjudication Decision which has been stayed:
a) Finance charges; and b) Preparation of documents and research. |
|
|
|
|
|
|
|
|
发表于 27-12-2018 05:42 AM
|
显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
30 Sep 2018 |
| INDIVIDUAL PERIOD | CUMULATIVE PERIOD | CURRENT YEAR QUARTER | PRECEDING YEAR
CORRESPONDING
QUARTER | CURRENT YEAR TO DATE | PRECEDING YEAR
CORRESPONDING
PERIOD | 30 Sep 2018 | 30 Sep 2017 | 30 Sep 2018 | 30 Sep 2017 | $$'000 | $$'000 | $$'000 | $$'000 |
1 | Revenue | 234,884 | 301,227 | 634,537 | 653,161 | 2 | Profit/(loss) before tax | 8,307 | 22,344 | 16,045 | 45,334 | 3 | Profit/(loss) for the period | 3,617 | 16,877 | 4,498 | 33,447 | 4 | Profit/(loss) attributable to ordinary equity holders of the parent | -801 | 10,288 | -3,901 | 21,485 | 5 | Basic earnings/(loss) per share (Subunit) | -0.16 | 2.08 | -0.79 | 4.34 | 6 | Proposed/Declared dividend per share (Subunit) | 2.50 | 3.00 | 2.50 | 3.00 |
|
| AS AT END OF CURRENT QUARTER | AS AT PRECEDING FINANCIAL YEAR END | 7
| Net assets per share attributable to ordinary equity holders of the parent ($$) | 0.7230 | 0.9336
|
|
|
|
|
|
|
|
|
发表于 14-1-2019 02:36 AM
|
显示全部楼层
本帖最后由 icy97 于 17-1-2019 08:07 AM 编辑
富达suke工程遭中止
http://www.enanyang.my/news/20181214/富达suke工程遭中止br-股价暴跌15/
Type | Announcement | Subject | OTHERS | Description | TERMINATION OF CONSTRUCTION OF THE SUNGAI BESI-ULU KELANG ELEVATED EXPRESSWAY (SUKE) | The Company wishes to announce that its subsidiary, HCM Engineering Sdn Bhd (“HCM”) has received a letter of termination from Turnpike Synergy Sdn Bhd (“TSSB”) for the construction of the proposed Sungai Besi-Ulu Kelang Elevated Expressway (SUKE) (“Project”) undertakes by the joint venture between HCM and Hatimuda Sdn Bhd (“Hatimuda”) on a 40% : 60% basis (HCM-Hatimuda JV”).
HCM-Hatimuda JV was awarded with the Project by TSSB in August 2016 with a value of approximately RM315.8 million and was expected to complete it in 30 months period by 28 February 2019.
The notice of termination was served by TSSB as a result of an overall delay and physical delay of the Project undertaken by HCM-Hatimuda JV.
The Project was solely financed, implemented and managed by the joint venture party, Hatimuda, hence, the termination does not have any significant impact on the net assets and earnings of Protasco Group for the current financial year and year ending 31 December 2019. |
|
|
|
|
|
|
|
|
发表于 14-1-2019 06:31 AM
|
显示全部楼层
Type | Announcement | Subject | OTHERS | Description | TERMINATION OF CONSTRUCTION OF THE SUNGAI BESI-ULU KELANG ELEVATED EXPRESSWAY (SUKE) | We refer to our announcement dated 13 December 2018 and wish to announce the additional information in relation to the Termination as follows:
The SUKE Project had generated approximately RM680,000 profit to the earnings of the Group for financial years 2016, 2017 and 2018.
Following the earlier termination of the Project, the Group’s future earnings will be affected by approximately RM2.6 million. |
|
|
|
|
|
|
|
|
发表于 18-1-2019 03:45 AM
|
显示全部楼层
|
|
|
|
|
|
|
发表于 3-3-2019 08:35 AM
|
显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
31 Dec 2018 |
| INDIVIDUAL PERIOD | CUMULATIVE PERIOD | CURRENT YEAR QUARTER | PRECEDING YEAR
CORRESPONDING
QUARTER | CURRENT YEAR TO DATE | PRECEDING YEAR
CORRESPONDING
PERIOD | 31 Dec 2018 | 31 Dec 2017 | 31 Dec 2018 | 31 Dec 2017 | $$'000 | $$'000 | $$'000 | $$'000 |
1 | Revenue | 257,805 | 286,116 | 892,342 | 939,277 | 2 | Profit/(loss) before tax | -39,879 | 24,993 | -23,834 | 70,327 | 3 | Profit/(loss) for the period | -41,527 | 12,976 | -37,029 | 46,423 | 4 | Profit/(loss) attributable to ordinary equity holders of the parent | -44,647 | 6,578 | -48,548 | 28,063 | 5 | Basic earnings/(loss) per share (Subunit) | -9.02 | 1.55 | -9.81 | 6.62 | 6 | Proposed/Declared dividend per share (Subunit) | 0.00 | 3.00 | 2.50 | 3.00 |
|
| AS AT END OF CURRENT QUARTER | AS AT PRECEDING FINANCIAL YEAR END | 7
| Net assets per share attributable to ordinary equity holders of the parent ($$) | 0.6735 | 0.9336
|
|
|
|
|
|
|
|
|
发表于 14-3-2019 08:00 AM
|
显示全部楼层
Type | Announcement | Subject | TRANSACTIONS (CHAPTER 10 OF LISTING REQUIREMENTS)
RELATED PARTY TRANSACTIONS | Description | PROTASCO BERHAD ("PROTASCO" OR THE "COMPANY")PROPOSED JOINT DEVELOPMENT BETWEEN DE CENTRUM RETAIL SDN BHD ("DCRSB"), A WHOLLY-OWNED SUBSIDIARY OF PROTASCO DEVELOPMENT SDN BHD, WHICH IN TURN IS A WHOLLY-OWNED SUBSIDIARY OF PROTASCO, AND PENMALAND SDN BHD ("PENMALAND") TO JOINTLY DEVELOP THREE (3) CONTIGUOUS PARCELS OF FREEHOLD DEVELOPMENT LAND IN MUKIM OF TAMPIN TENGAH, DISTRICT OF TAMPIN, NEGERI SEMBILAN DARUL KHUSUS ("TAMPIN LAND") ("PROPOSED JOINT DEVELOPMENT") | On behalf of the Board of Directors of Protasco, RHB Investment Bank Berhad wishes to announce that DCRSB had on 1 March 2019 entered into a conditional joint development agreement with Penmaland to jointly develop the Tampin Land into a mixed residential development.
Further details of the Proposed Joint Development are set out in the attachment.
This Announcement is dated 1 March 2019. | http://www.bursamalaysia.com/market/listed-companies/company-announcements/6084945
|
|
|
|
|
|
|
|
发表于 4-4-2019 04:23 AM
|
显示全部楼层
Type | Announcement | Subject | OTHERS | Description | COMMENCEMENT OF ADJUDICATION PROCEEDINGS BY HCM ENGINEERING SDN BHD AGAINST SOUTHKEY CITY SDN BHD | Protasco Berhad (“Company”) wishes to announce that its wholly-owned subsidiary, HCM Engineering Sdn Bhd (“HCM”) had filed a Notice of Adjudication under Section 8 of the Construction Industry Payment Adjudication Act 2012 (CIPAA) with the Asian International Arbitration Centre (“AIAC”) Kuala Lumpur to commence adjudication proceedings against Southkey City Sdn Bhd (“SCSB”), the developer of a property development project known as Southkey City, situated at Johor Bahru, Johor Darul Takzim.
The adjudication proceedings were commenced to seek resolution on contractual disputes covering HCM’s claims from SCSB for the principal amount of RM3,475,129.42 for construction works done and due to non-payment by SCSB. HCM is also claiming for late payment interest and cost, the amount of which will be determined at a later stage.
The claims were in relation to a Letter of Acceptance of Offer dated 3rd December 2015, wherein SCSB engaged HCM as the Main Contractor for the Construction, Completion, Testing, Commissioning and Handover of Water Reticulation Works Phase 1 (Package 1A) for a project known as “Cadangan Membina Dan Menyiapkan Kerja-Kerja Infrastruktur Bagi Pembangunan Bercampur Di Atas Lot PTD 14853 (Lot Lama), Mukim Plentong, Johor Bahru, Johor Darul Takzim Untuk Tetuan Southkey City Sdn Bhd” for a contract sum of RM3,221,998.90.
|
|
|
|
|
|
|
|
|
发表于 26-6-2019 07:06 AM
|
显示全部楼层
Date of change | 18 May 2019 | Name | MR HO CHUN FUAT | Age | 52 | Gender | Male | Nationality | Malaysia | Type of change | Demised | Designation | Chief Financial Officer |
|
|
|
|
|
|
|
|
发表于 1-7-2019 08:55 AM
|
显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
31 Mar 2019 |
| INDIVIDUAL PERIOD | CUMULATIVE PERIOD | CURRENT YEAR QUARTER | PRECEDING YEAR
CORRESPONDING
QUARTER | CURRENT YEAR TO DATE | PRECEDING YEAR
CORRESPONDING
PERIOD | 31 Mar 2019 | 31 Mar 2018 | 31 Mar 2019 | 31 Mar 2018 | $$'000 | $$'000 | $$'000 | $$'000 |
1 | Revenue | 166,283 | 157,470 | 166,283 | 157,470 | 2 | Profit/(loss) before tax | 7,753 | 4,346 | 7,753 | 4,346 | 3 | Profit/(loss) for the period | 4,066 | 1,288 | 4,066 | 1,288 | 4 | Profit/(loss) attributable to ordinary equity holders of the parent | 1,229 | -2,141 | 1,229 | -2,141 | 5 | Basic earnings/(loss) per share (Subunit) | 0.25 | -0.43 | 0.25 | -0.43 | 6 | Proposed/Declared dividend per share (Subunit) | 0.60 | 0.00 | 0.60 | 0.00 |
|
| AS AT END OF CURRENT QUARTER | AS AT PRECEDING FINANCIAL YEAR END | 7
| Net assets per share attributable to ordinary equity holders of the parent ($$) | 0.6821 | 0.6741
|
|
|
|
|
|
|
|
|
发表于 1-7-2019 08:59 AM
|
显示全部楼层
EX-date | 18 Jun 2019 | Entitlement date | 19 Jun 2019 | Entitlement time | 05:00 PM | Entitlement subject | Ordinary Dividend | Entitlement description | Dividend of 0.6 sen per share | Period of interest payment | to | Financial Year End | 31 Dec 2019 | Share transfer book & register of members will be | to closed from (both dates inclusive) for the purpose of determining the entitlement | Registrar or Service Provider name, address, telephone no | BOARDROOM SHARE REGISTRARS SDN BHDLevel 6, Symphony HousePusat Dagangan Dana 1Jalan PJU 1A/4647301Petaling JayaTel:0378418088Fax:0378418100 | Payment date | 10 Jul 2019 | a.Securities transferred into the Depositor's Securities Account before 4:30 pm in respect of transfers | 19 Jun 2019 | b.Securities deposited into the Depositor's Securities Account before 12:30 pm in respect of securities exempted from mandatory deposit |
| c. Securities bought on the Exchange on a cum entitlement basis according to the Rules of the Exchange. | Number of new shares/securities issued (units) (If applicable) |
| Entitlement indicator | Currency | Currency | Malaysian Ringgit (MYR) | Entitlement in Currency | 0.006 |
|
|
|
|
|
|
|
|
发表于 24-7-2019 06:04 AM
|
显示全部楼层
Date of change | 16 Jul 2019 | Name | MR CHEONG KAH WANG | Age | 53 | Gender | Male | Nationality | Malaysia | Type of change | Appointment | Designation | Chief Financial Officer | QualificationsNo | Qualifications | Major/Field of Study | Institute/University | Additional Information | 1 | Professional Qualification | Accounting | The Association of Chartered Certified Accountants (ACCA) United Kingdom (UK) | | 2 | Professional Qualification | Accounting | Malaysian Institute of Accountants (MIA) | |
| | Working experience and occupation | Having worked in the private sector for more than 20 years covering manufacturing, trading, services, oil & gas, construction and investment holding. Mr Cheong has extensive exposure in the field of financing reporting, financial analysis, project financing, international trade and legal recovery. His exposure in international trade and project financing has taken him to Singapore, Philippines, Indonesia, Hong Kong and China. He has dealt with local and international bankers for project financing and group reporting. |
|
|
|
|
|
|
|
|
发表于 29-8-2019 07:24 AM
|
显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
30 Jun 2019 |
| INDIVIDUAL PERIOD | CUMULATIVE PERIOD | CURRENT YEAR QUARTER | PRECEDING YEAR
CORRESPONDING
QUARTER | CURRENT YEAR TO DATE | PRECEDING YEAR
CORRESPONDING
PERIOD | 30 Jun 2019 | 30 Jun 2018 | 30 Jun 2019 | 30 Jun 2018 | $$'000 | $$'000 | $$'000 | $$'000 |
1 | Revenue | 188,621 | 242,183 | 354,904 | 399,653 | 2 | Profit/(loss) before tax | 9,917 | 3,392 | 17,670 | 7,738 | 3 | Profit/(loss) for the period | 4,590 | -407 | 8,656 | 881 | 4 | Profit/(loss) attributable to ordinary equity holders of the parent | 2,759 | -959 | 3,988 | -3,100 | 5 | Basic earnings/(loss) per share (Subunit) | 0.56 | -0.19 | 0.81 | -0.63 | 6 | Proposed/Declared dividend per share (Subunit) | 0.60 | 0.00 | 0.60 | 0.00 |
|
| AS AT END OF CURRENT QUARTER | AS AT PRECEDING FINANCIAL YEAR END | 7
| Net assets per share attributable to ordinary equity holders of the parent ($$) | 0.6828 | 0.6741
|
|
|
|
|
|
|
|
| |